This third phase of the Dauphin Recreation Centre included a NHL size ice surface and 1,800 spectator seating area in a “bowl” configuration. The facility also included 8 team dressing rooms, public amenity areas, concessions, and complete loop walking track. Tower Engineering provided Project Management services.

Continue Reading

7 July

SOUTH INTERLAKE RECREATION CENTRE

, July 7, 2016

The 260’ x 140’ Arena is two stories with dressing rooms on the lower level and viewing/lobby space on the upper level. The arena has an 85 x 200 NHL size ice surface and implements heat recovery from ice plants as well as geothermal technology for heating, cooling, A/C, and domestic and flood water heating. The 30,000 sq. ft. arena was completed in 2006 with an Annual Energy Bill of $30,000 or half of what a conventional system would cost. Tower’s mechanical design won them the Schreyer Award. Tower Engineering provided Project Management, Mechanical, and Electrical Design services.

Continue Reading

7 July

PORTAGE CREDIT UNION CENTRE

, July 7, 2016

$41M facility is a joint project between the City of Portage la Prairie and the Municipality of Portage La Prairie. 120,000 sq. ft. facility incorporates an Aquatic Centre, with wave pool, Fitness Area, 2 NHL sized ice surfaces with C-shaped bowl seating for 1700 spectators, 12 dressing rooms, Multi-Purpose space. Tower Engineering provided Project Management, Structural, Mechanical, and Electrical Design service.

Continue Reading

7 July

FIRE PARAMEDIC STATION #21

, July 7, 2016

8,000 sq. ft. Fire and Paramedic Station. Tower Engineering preformed the role of Structural, Mechanical, and Electrical Engineering & Design.

Continue Reading

7 July

ABORIGINAL PERSONAL CARE HOME

, July 7, 2016

This 80 bed, one storey, long term care facility has been designed around a concept of a culturally familiar home within the Aboriginal community which respects the needs and on-going involvement of elders in the life of their families and community. Residents are accommodated in eight “houses” of 10 beds each with shared outdoor courtyards, planned around a circular, central core of communal and public areas which incorporates an adult day program and a multifunctional central gathering space. The design also reflects the Aboriginal respect for nature and the environment through the use of natural materials, indigenous Tyndal stone, and.

Continue Reading

7 July

MISIPAWISTIK CREE NATION

, July 7, 2016

The project consists of a 4,520 square foot medical healthcare centre complete with offices & clinical rooms. Tower Engineering preformed the role of Structural, Mechanical, and Electrical Engineering & Design.

Continue Reading

7 July

THE BIRTH CENTRE, ST. VITAL

, July 7, 2016

This project included renovating an existing 12,000 sq. building and an addition of 3000 sq. ft. The new building program includes a reception area, waiting room, birthing rooms, workspace, conference room, meeting room, offices, lounge, exam rooms, education room and ancillary services. Tower Engineering preformed the role of Mechanical, and Electrical Engineering & Design, site inspections and contract administration.

Continue Reading

7 July

BUHLER CENTRE

, July 7, 2016

Tower Engineering completed the mechanical and electrical design for this facility. Tower Engineering performed the required site inspections and carried out the contract administration throughout the entire construction phase of the project.

Continue Reading

7 July

PHOENIX SCHOOL

, July 7, 2016

Phoenix School is located at 111 Alboro Street in Headingley, Manitoba. The project was to add 2 additional classrooms to an existing school. Tower Engineering was retained to design Structural, Mechanical and Electrical systems for this addition.

Continue Reading

7 July

ST. JOHN’S RAVENSCOURT

, July 7, 2016

This Design Build was to replace the 1955 Hamber Hall classroom block with a new Senior School building and a new fitness centre. Tower Engineering performed complete Project and Construction Management services on behalf of the owner.

Continue Reading

Older Posts

Recent Comments

    Archives

    Categories

    • No categories

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org

    Kelowna

    Phone: 250.765.7224
    201 - 575 Osprey Ave
    Kelowna, BC, V1Y 5A7

    Calgary

    Phone: 403.235.2655
    100-2139 4th Avenue NW
    Calgary, AB T2N 0N6

    Winnipeg

    Phone: 204.925.1150
    Unit 1 - 1140 Waverley Street
    Winnipeg, MB R3T 0P4

    Quick Links

    • Cloud / FTP
    • Webmail
    • Careers
    © 2019 Tower Engineering Group. All Rights Reserved.
    Certification Logo
    • Home
    • About Us
    • Services
    • Our Projects
    • Contact Us